T-shirts & polos
Tees and polos,made to your spec.
Boxy, crew or oversized tees and piqué polos — produced for clothing brands and uniform programmes across Indonesia.
CPL produces T-shirts and polo shirts to your own design and tech pack, for clothing brands and company uniforms. Typical styles include boxy, crew-neck and oversized tees, piqué polos and knit polos. Production runs from 500 pieces per style (CMT) or 250 kg of fabric (FOB), with a sample in 7–14 days.
- 500 pcs
- Minimum per style (CMT)
- 250 kg
- Minimum fabric per order (FOB)
- 7–14 days
- Sampling
- 30–50 days
- Bulk, after sample approval
What we make
Styles we make.





Garment anatomy
What you'll decide on tees and polos.
Tap a number to see what you'll decide for that part.
Production planner
Plan your order.
Estimate the timeline, choose your specifications, then send it all in one WhatsApp message.
- Request
- Sample
- Bulk productionCutting · sewing · QC
- Ready
Choose your specifications.
Pick what fits, or choose Other and type it in. Everything goes into the same WhatsApp message.
Indicative only. Excludes your sample approval time; the confirmed schedule comes with our quotation.
How it works
From brief to packed garments.
Five steps, with one dedicated merchandiser from start to finish.
- 01Day 001 / 05
Send your brief
Design or tech pack, product, quantity, CMT or FOB — just send it on WhatsApp.

- 02Plan02 / 05
Quote & timeline
We reply with a quote and a production plan, including the materials needed.

- 037–14 days03 / 05
Sample
Made in our own sample room, for you to approve before production starts.

- 0430–50 days04 / 05
Bulk production
Cutting, sewing and finishing on our production lines once the sample is approved.

- 05AQL05 / 05
Final inspection
Checked piece by piece to AQL, then packed to your specification.

Questions
What is the minimum order for T-shirts?
500 pieces per style with CMT (you supply the fabric), or 250 kg of fabric per order with full-package FOB.
Can you make polo shirts for company uniforms?
Yes. Piqué polos are a common uniform piece — see our uniforms page for corporate, hotel and factory programmes.
Can you source the fabric?
Yes. With full-package FOB, CPL sources fabric and trims to your specification. With CMT, you supply the fabric.
How long does T-shirt production take?
Sampling takes 7–14 days; bulk production about 30–50 days after you approve the sample.
Explore
More ways we can help.
Bring your tee.We'll make it.
Send your design and target quantity — we'll reply with a quote and timeline.